Tongda11 Auto Chrome Plating Machine Galvanizing Line Hang Plating Electroplating Equipment

Tongda11 Auto Chrome Plating Machine Galvanizing Line Hang Plating Electroplating Equipment

Tongda11 Auto Chrome Plating Machine Galvanizing Line Hang Plating Electroplating Equipment Semi Automatic Plating Machi
Basic Info.
Model NO. TD 11
Service Lifelong Technology Support
Thickness of Tankthickness of Tank 15 mm / Customized
Control System Manual Push Button Control
Plating Process Design According Customizer Plating Product
Accessories Heating System, Crane Lifting, Rectifier and etc.
Size Customized
Coating Zinc /Copper/Chrome/Gold and etc. Coating
Product Item Metal Electroplating Machinery
Plating Type Barrel Plating
Transport Package Usually to Ba Packed in Plywood Box
Specification Non-standard
Trademark Tongda
Origin China
HS Code 8543300090
Production Capacity 20 Sets/Month
Product Description
Tongda11 Auto Chrome Plating Machine Galvanizing Line Hang Plating Electroplating Equipment Semi Automatic Plating Machine

Tongda11 Auto Chrome Plating Machine Galvanizing Line Hang Plating Electroplating Equipment


Tongda11 Auto Chrome Plating Machine Galvanizing Line Hang Plating Electroplating Equipment

Automatic TypeSemi automatic
Tanks material15mm PP Plate/PVC
Plating TypeBarrel plating , Hang plating
Control SystemManual push button control
machine frameSteel body with anti-corrosion and resistant Epoxy painting .
Accessories PP Tank , PP barrel , Crane lifting , hanger , rectifier and etc.
External DeviceTumbling Machine ,Vibrating Polishing machine , Ultrasonic Cleaner, Drying Machine, Oven, rectifier, Filter, Water Chiller and etc.


Our services

Testing before delivery :

Tongda11 Auto Chrome Plating Machine Galvanizing Line Hang Plating Electroplating Equipment

Runing testing :
We will installed the equipment and operate it . Meantime , we will take the testing videos to the customer to confirm it .

Tongda11 Auto Chrome Plating Machine Galvanizing Line Hang Plating Electroplating Equipment


Anti-leakage testing :We will fill the tanks with water after welding and before installation , the testing time last 72 hours .
Auxiliary equipment:shipping:
Package mode : by plywood or shipping by container directly . Shipping :Ocean shipping Lead time : 30-35 working daysWelcome customized :the electroplating line is non-standard , it is designed according to your products information .